Completed project : MINH TRUNG High Tech Aquaculture Water Treatment Plant – Ninh Thuan, Vietnam 2023

Finished and handed-over MINH TRUNG – High Tech Aquaculture Water Treatment Plant in Ninh Thuan province

End of 2023, NTESCO’s technical team has finished and handed-over Minh Trung project: 4th High Tech Aquaculture Water Treatment Plant  to customer in Ninh Thuan province, Vietnam

Project information:

After Ninh Thuan 1, My Viet 1, My Viet 2, Minh Trung is the 4th water treatment plant in the area of the same investor – a leading aquaculture company in Vietnam, who trusted and choose NTESCO as the reputation contractor to supply full package: process design, equipment supply and installation. This project includes 2 main treatment areas:

This project includes 2 main treatment plants:

  1. High-tech aquaculture water treatment plant – with specialized NAS process (Natural Arithmetic System) researched and designed by NTESCO
  2. Aquaculture wastewater treatment and reuse plant – with specialized NRS process (Natural Recovery System) also researched and designed by NTESCO
NAS & NRS specialized processes – Ntesco’ cutting-edge solutions adapt to Client’ requirements

Aquaculture business ecosystem which maintain of value of human culture finance will be big impact in aquaculture world by concept of on-line traceability, searching for sustainable of environment and aquaculture industries , Quality of Aquaculture supply water those active in future disease virus due to biodiversity of environment make NAS system work on future and reliable with value of investment besides this NRS system create green/blue water from grey water starting new world of aquaculture industries by concept of eco system friendly .

Benefits for investor:
  • Supply and return water to use with non-Vibrio & EHP for hatchery in time
  • Environment friendly and follow Safety Environment Issue of Vietnam government
  • Generate fresh water to use
  • Generate water with high salinity to treat shrimp process
  • On-line monitoring & traceability.
  • Save operation cost.
  • Save space 50% – 60% from conventional system

After installation is completed , the project will improve production capacity as well as product quality of customer, who was called “biggest shrimp breeder producer in Vietnam”

NTESCO is committed to strictly controlling all of process of installation and ensuring completed on schedule with safely, quality and achieve all owner’ requirement.

Some images of the project:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHARE