Completed project: Water treatment system for residential at HCMC,

Central water treatment system for Building

Place : HCMC – Vietnam

Total capacity : 720 CMD (1 system)

Background:

City water quality is not stable all the time and the Owner want to supply water follow TCVN 01-2009/BYT to residents

This is 3rd system that NTESCO installs at the area

Equipment:

N-HFM

Efficiency:

• Water Quality upgrade to drinking able water Quality from city water
• Zero water scarcity.
• water supply follow: QCVN 01:2009 /BYT

Year: 2021

SHARE