Post
29
09 - 2023
Completed project: Water treatment system for residential at HCMC,
Central water treatment system for Building
Place : HCMC – Vietnam
Total capacity : 720 CMD (1 system)
Background:
City water quality is not stable all the time and the Owner want to supply water follow TCVN 01-2009/BYT to residents
This is 3rd system that NTESCO installs at the area
Equipment:
N-HFM
Efficiency:
• Water Quality upgrade to drinking able water Quality from city water
• Zero water scarcity.
• water supply follow: QCVN 01:2009 /BYT
Year: 2021


