Started installation of “Aquaculture water treatment & reuse wastewater plant”
After finished preparation at the workshop and safety transportation all of equipment… to the site, NTESCO’s team has started installation of the project: Aquaculture Water Treatment & Reuse Wastewater Plant in Binh Dai – Ben Tre.
This is the 4th project in the locality of the same investor – a leading aquaculture company in Vietnam, who trusted and choose NTESCO as the reputation contractor to supply full package: process design, equipment supply and installation.
The project is expected to be completed after 3 months of installation. The high-tech water treatment finished plant will :
This project includes 3 main areas:
- High-tech aquaculture water treatment – with specialized process NAS (Natural Arithmetic System) designed by NTESCO
- Stored rainwater treatment
- Aquaculture wastewater treatment and reuse – with NRS process (Natural Recovery System) is also researched and designed by NTESCO
The project is expected to be completed after 3 months of installation.
After installation is completed , the project will help to increase total production capacity as well as product quality of the customer.
NTESCO is committed to strictly controlling all of process of installation and ensuring completed on schedule with safely, quality and achieve all owner’ requirement.
some images of preparation, transportation and positioning processes