Nov 2022, after 5 months for installation, NTESCO’s technical team has finished and Hand-over to customer the project: High Tech Aquaculture Water Treatment Plant for customers in Dong Hai – Bac Lieu province.
This project includes 2 main treatment plants:
- High-tech aquaculture water treatment plant – with specialized NAS process (Natural Arithmetic System) researched and designed by NTESCO
- Aquaculture wastewater treatment and reuse plant – with specialized NRS process (Natural Recovery System) also researched and designed by NTESCO
After installation is completed , the project will improve production capacity as well as product quality of customer, who was called “biggest shrimp breed procedure in Vietnam”
NTESCO is committed to strictly controlling all of process of installation and ensuring completed on schedule with safely, quality and achieve all owner’ requirement.
Some images of the project:
- Area 1: High-tech aquaculture water treatment plant – with specialized process NAS
- Area 2: Aquaculture wastewater treatment and reuse plant – with specialized process NRS